Published 03/7/2026

Never Stop Exploring for

World Class Manufacturing

with our Global Operation Centers

Xi'An

Bert SUN

Factory General Manager

Manufacturing Ambitions

Lift Xi'An OEE

Raise Xi'An line effectiveness through stronger availability, performance, and quality basics.

Stabilize Xi'An MTBF

Extend Xi'An time between failures by tightening preventive and response discipline.

Scale Xi'An Best Practice

Share repeatable Xi'An manufacturing improvements with clear operating owners.

Production Process

Process Details

Diode Laser Assembly

Laser Assembly 3 steps
1

Step 1

Submount Preparation

Clean AuSn submounts and confirm incoming ceramic lot traceability.
2

Step 2

Chip Attach

Attach diode chips with controlled bond pressure, temperature, and dwell time.
3

Step 3

Wire Bond

Complete bond loop validation before the optical alignment window opens.

Availability, performance, and quality

OEE

%

Equipment uptime trend

MTBF

Hours

Operation Center Used Standards

See all

Operation Center News

Sort By